Huntingdonshire District Council has used the National Re:fit Programme as a partner of Cambridgeshire County Council’s Re:fit project. – Local Partnerships Huntingdonshire District Council has used the National Re:fit Programme as a partner of Cambridgeshire County Council’s Re:fit project. – Local Partnerships

Huntingdonshire District Council has used the National Re:fit Programme as a partner of Cambridgeshire County Council’s Re:fit project.

Local Government
Huntingdonshire District Council has used the National Re:fit Programme as a partner of Cambridgeshire County Council’s Re:fit project.

The aim is to build capacity and skills in the region’s local authorities to bring forward investment into energy efficiency and renewable energy generation projects.

Huntingdonshire District council identified that six of its One Leisure centres needed improvements and included them as part of Cambridgeshire’s portfolio of buildings to be investigated by the selected service provider:

  • St Ives Indoor and Outdoor Leisure Centres
  • St Neots Leisure Centre
  • Huntingdon Dry and Wet Leisure Centre
  • Sawtry Leisure Centre

Huntingdonshire District Council is aware of the increasing pressure to deliver services cost effectively, these buildings have a combination of aged mechanical and electrical infrastructure and building construction. The rising cost of energy is adding strain on operational budgets and brought a new focus on asset energy performance.

Local Partnerships supported the Council in delivering its Re:fit project by providing analysis of its sites, assisting with internal approvals and supplying quality assurance reviews of the technical documentation produced by the selected service provider Bouygues, to help gain approval to install relevant measures.

The planned works for these leisure centres will encompass a large number of energy conservation solutions (ECMs) across the buildings. It has been identified that this project could save 14 per cent off the leisure centres’ annual energy bills, with an average payback period of 9.6 years.

Huntingdonshire District Council is delivering needed improvements to its leisure centres. The guaranteed energy savings allowed these projects to be progressed and allowed the Council to reduce energy bills and also improve our customers’ experience.

Neil Sloper, Operations Head of Service

Project: Huntingdonshire District Council – One Leisure centres

Savings:
Minimum of £78,700 energy spend reduction per annum
821,380 kWh energy savings per annum
Around 350 tonnes of CO2 per annum saved
Value: £831,890 investment of retrofit works
Simple payback of 9 years
Timescale: Installation commenced in January 2017

The Council’s leisure centres project encompasses a number of energy-efficiency measures across their sites. These are listed below.

Lighting replacement and control upgrade

Installation of high-efficiency LED lighting will ensure that savings can be made as cost effective as possible by maximising the lifetime of the existing assets. The proposed LED products have been specified as suitable alternatives to the existing lighting to ensure that the Council’s energy savings and payback criteria are met. The new LEDs will also ensure that lighting levels are maintained or improved.

Solar PV

A range of roof-mounted solar arrays across several of the buildings will ensure the sites have displaced electricity usage. This will ensure savings are achieved with less electricity being used from the grid.

Building Energy Management Systems (BEMS) and remote optimisation

Installation of new BEMS to allow integration of current controls to optimise existing systems and prevent equipment working in conflict, together with the use of remote management controls will provide a full and clear understanding of the buildings’ operation, and reduce running costs

Boiler replacements and controls

Existing inefficient boilers are to be replaced with new high-efficiency new boilers. As the existing chimney stacks are being utilised and it was not possible to install condensing boilers or biomass boilers .

Mechanical Works

Installation of boiler motorised valves and thermostatic mixing valves

Insulation

Heat loss through un-insulated pipework can generate high surface temperatures. This wastes energy and is also a health and safety risk if touched. A range of insulating solutions will be applied to the buildings’ exposed pipes and flanges in plant rooms and their heating system pipework.

Pool pump control

The installation and commission of a new pool pump, chemical dosing controls and control panels will reduce the speed and related energy consumption of the pool pumps overnight and during periods of low use.

Energy efficiency and financial savings through Re:fit Re:fit is a procurement framework and support service available to all public sector organisations in the UK. Since 2009 it has been helping organisations to deliver “spend-to-save” environmental retrofit projects that both improve their buildings and, importantly, make substantial guaranteed financial savings.

Related Articles

See how councils and communities are working together

Insights
Read in – 3 minutes
Protecting essential public services through a complex PPP contract transition – Isle of Wight
Overview When Isle of Wight Council faced the early termination of its long-term waste PPP contract, the priority was to protect an essential public service and ensure residents experienced no disruption. With independent specialist support from Local Partnerships, alongside DEFRA and NISTA, the Council successfully transitioned waste services to a new operator within an exceptionally […]
Read more
Insights, News
Read in – 4 minutes
Public Sector Challenge 2026 – Earth, Mynd and Shire
A team of seven intrepid explorers from Local Partnerships took part in the Public Sector Challenge last week, which this year took place in the beautiful Shropshire Hills, to raise money for the British Heart Foundation and Cancer Research UK. With a selection of routes to choose from ranging from 8.5 miles to 26 miles, […]
Read more
Local Government
UK Central Government
Insights, Articles, Strategic partnerships, TheMJ
Read in – 2 minutes
Making missions reality: discussion to delivery
The test for any new government is whether anything changes, for the better, in practice. This article originally appeared in The MJ as sponsored content from Local Partnerships. That is why delivery capability must be treated as strategic infrastructure. Good policy and ambition are necessary, but not sufficient. Programmes succeed when business cases are robust, […]
Read more

Contact Local Partnerships

Do you have a project you would like help with, or could we answer a question about our services? Please message us here.

Name(Required)
Local Partnerships Logo Talk to Us
Hi there! Let us know if there’s anything we can help you with

Ready to start a conversation

We work best when we understand what matters most to you. Get in touch and let’s explore how we can help.
Talk to us
Local Partnerships Logo

Ready to find out more?

Keep up with the latest updates!

© Local Partnerships 2026 | Local Partnerships LLP is a limited liability partnership registered in England and Wales no. OC346845. The registered address is 18 Smith Square, London SW1P 3HZ.